Initiation Stage

Digital Protection Relay Test Procedure Elaboration

Company: ONEE-BE (Mohammedia Thermal Power Plant) | Duration: July 2024 – August 2024

#SIPROTEC #SubstationTesting #ElectricalProtection

Core Objectives

The primary goal was to elaborate a formal, structured testing procedure for the Siemens **SIPROTEC digital protection relays** installed on the thermal power plant's alternator and transformers. This involved bridging theoretical knowledge of electrical protection with hands-on application using professional testing equipment.

Main Themes & Execution

Key Areas of Focus:

  • Relay Configuration Analysis: Detailed study of Siemens SIPROTEC 7UT6x family relays and their specific protective functions (e.g., Differential 87G, Overcurrent 51G, Stator Earth Fault 64G).
  • Test Protocol Development: Creation of step-by-step procedures to verify the trip settings, pickup times, and overall logic of each protective function.
  • Hands-on Testing: Practical application of test protocols using the **OMICRON CMC Test Universe** to simulate fault conditions and measure the relay response time.
  • Critical Equipment Verification: Focused on protection schemes for the main **Alternator** and **Step-Up Transformers** (Generator/Unit Protection).

Results and Takeaways

Achieved Outcomes

The project successfully delivered a robust, documented test procedure, ensuring the protection settings met the required grid standards. This experience provided practical mastery of high-voltage power system protection and diagnostic tools.

  • Validated the entire protection chain from CT/VT secondary terminals through the relay logic to the trip outputs.
  • Gained proficiency in the **Omicron Test Universe** suite (Quick CMC, Ramping, State Sequencer).
  • Developed a deep appreciation for the strategic role of protection relays in ensuring the reliability and safety of a major power plant.

Visuals & Evaluation

On-Site Work & SIPROTEC Relays:

Rafi Nasrallah working on Siemens SIPROTEC relay testing.

Working on the SIPROTEC protection relay panel.

Setup of the OMICRON CMC kit for electrical protection testing.

OMICRON CMC test kit setup in the electrical workshop.

Supervisor's Evaluation (18.5/20)

Overall Remarks:

"Good asset."
(Original: "Bon élément")
The overall grade awarded was 18.5/20.

Full Evaluation Sheet:

Supervisor's Detailed Evaluation of ONEE Internship Performance

Evaluation Sheet from Mr. M. Mouzouri, ONEE Internship Supervisor.